Work break down structure | Architecture and Design homework help
[ad_1]
This week’s assignment is to create a work breakdown structure (WBS) for the project you selected during Unit 2. This is part of your Course Project
Create a high-level WBS of at least three levels: • Each level should have with a minimum of five level 1 tasks, two level 2 tasks, and three (3) Level 3 tasks. • Describe each task (work package) in your WBS with just enough information so that everyone in the team can understand what each work package means. • Level Numbering: o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0. o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc., o The third level of tasks should be numbered 1.1.1, 1.1.2, 1.1.3, 1.2.1, 1.2.2. 1.2.3 etc.
Submit a Word document. • There is no need to use APA formatting for this assignment.
[ad_2]
Source link